This document is a report of a Baseline Study for CoST Malawi. The purpose of the Baseline Study was to provide information against which to evaluate the short and longer-term impact of CoST in Malawi, during the pilot project and any subsequent phases.
![CoST board report and financial statement, 2017](https://infrastructuretransparency.org/wp-content/uploads/2018/05/Layer-71-e1529658634647.jpg)